New Modern Art Deco Home

Insulation under rebar, pipes for radiant heating installed before the slab is poured

Pouring the slab

Wiring and radiant heating pipes

Wiring for dimmers

Entry to master bedroom

Dining room ceiling joists

See-through fireplace is installed

Master bathroom tub is installed and protected

Stairway framing is completed

Kitchen “trayed” ceiling framing for indirect LED lighting

How do electricians keep track of all the wires?

Dimmer system wiring

Entry hall with “trayed” ceiling; Millgard “Ultra” entry door and sidelite

Progress with framing — looking into the master suite from the hallway

Kitchen stub wall and freezer niche under stairway

Kitchen windows installed; downdraft duct had to be installed before the concrete was poured

Kitchen wiring and plumbing have to be notched into the ICF walls

Laundry room plumbing and wiring

Living room : glulam beams are stained, doors and windows are installed, and column framing is in process

Master suite plumbing and wiring

Stairway framing

Second floor: office kitchenette and supply closet

Second-floor offices

Second floor offices and bathroom

Second-floor hallway with doorway for future elevator

Second-floor offices and sound insulation in walls